Greenfield (FOSTER CREEK - BREWSTER)

Greenfield

Douglas County, Washington · WECC

DC Readiness
54.6
Fair / 100

Greenfield (FOSTER CREEK - BREWSTER) is a greenfield datacenter candidate site in Douglas County, Washington, interconnecting through WECC. It screens at 54.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFOSTER CREEK
Substation voltage115 kV
Available capacity100 MW
Utility commercial rate0.05¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPH5 Data Centers Quincy
IXP distance55.5 mi
Fiber providers5
Fiber coverage1.5%
Nearest cloud providerAzure
Nearest cloud regionwestus2
Cloud region distance57.0 mi

Site characteristics

Site typeGreenfield
Parcel ownerBONNEVILLE POWER ADMINISTRATION
Land owner typeprivate
Buildability80.0/100
Land cover (NLCD)Grassland/Herbaceous

Risk & environment

Flood zoneZone X
Water stress (WRI)1.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score72/100
Construction cost index75.3 (avg 100)

Location context

Nearest datacenterMicrosoft EAT03
DC distance49.8 mi
Nearest rail3.9 mi
Nearest gas pipeline50.6 mi
Nearest fiber route117.3 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.83¢/kWh
Industrial electricity3.97¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$2,784

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
28
Speed to power15%
33
Fiber connectivity12%
49
Energy cost10%
97
Water risk8%
64
Natural hazard8%
72
Buildability7%
80
Labor market4%
50
DC cluster4%
50
Land / acreage3%
48
Construction cost3%
87
Gas pipeline2%
0
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Douglas County, ranked by DC Readiness.

Sites near Greenfield (FOSTER CREEK - BREWSTER)
SiteTypeVoltageCapacityQueue waitScore
GRAND COULEE 500KVSubstation-Adjacent500 kV1,000 MW1.7 yrs69.6
GRAND COULEE 230KVSubstation-Adjacent500 kV1,000 MW1.7 yrs69.4
GRAND COULEESubstation-Adjacent500 kV1,000 MW1.7 yrs68.8
Greenfield (SCHULTZ - SICKLER)Greenfield500 kV1,000 MW1.7 yrs68.6
CHIEF JOSEPHSubstation-Adjacent500 kV1,000 MW1.7 yrs67.7
Greenfield (CHIEF JOSEPH - SICKLER)Greenfield500 kV1,000 MW1.7 yrs66.4
FOSTER CREEKSubstation-Adjacent230 kV300 MW1.7 yrs66.0
WELLSSubstation-Adjacent230 kV300 MW1.7 yrs65.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (FOSTER CREEK - BREWSTER), Douglas County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.