Skip to content
Gridcensus

Winchester County, Virginia · PJM

DC Readiness
63.9
Good / 100

MEADOW BROOK is a substation-adjacent datacenter candidate site in Winchester County, Virginia, interconnecting through PJM. It screens at 63.9/100 DC Readiness with a catalogued 1,000 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMEADOW BROOK
Substation distance0.0 mi
Substation voltage500 kV
Available capacity1,000 MW

Speed to power

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDigital Realty GNV (8217 Linton Hall)
IXP distance40.4 mi
Fiber providers3
Fiber coverage84.8%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMiddletown Data Center
DC distance3.4 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.17¢/kWh
Industrial electricity8.93¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
100
Speed to power15%
38
Fiber connectivity12%
42
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Winchester County, ranked by DC Readiness.

Sites near MEADOW BROOK
SiteTypeVoltageCapacityQueue waitScore
Greenfield (DOUBS - NEW CREEK WIND)Greenfield500 kV1,000 MW3.8 yrs56.5
UNKNOWN121557Substation-Adjacent138 kV100 MW3.8 yrs55.6
DOUBLE TOLL GATESubstation-Adjacent138 kV100 MW3.8 yrs55.6
GREENWOODSubstation-Adjacent138 kV100 MW3.8 yrs55.6
WEST WINCHESTERSubstation-Adjacent138 kV100 MW3.8 yrs55.6
IMPRESSIONS GROUP, INC. (QUICK PRINTING)Manufacturing3.5 yrs55.4
O'SULLIVAN FILMS, INC. (PLASTICS PACKAGING FILM AND SHEET (INCLUDING LAMINATED) MANUFACTURING)Manufacturing3.5 yrs55.4
WINCHESTER COLD STORAGE CO., INC. (ICE MANUFACTURING)Manufacturing3.5 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MEADOW BROOK, Winchester County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.