WORLD TEST SYSTEMS, INC. (INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS)

Manufacturing

Waynesboro city, Virginia

DC Readiness
49.5
Fair / 100

WORLD TEST SYSTEMS, INC. (INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS) is a manufacturing datacenter candidate site in Waynesboro city, Virginia. It screens at 49.5/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXPEquinix CU1/CU2/CU3/CU4 - Culpeper
IXP distance55.5 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterDBT Data - Harrisonburg Center
DC distance26.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
54
Fiber connectivity12%
31
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Waynesboro city, ranked by DC Readiness.

Sites near WORLD TEST SYSTEMS, INC. (INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS)
SiteTypeVoltageCapacityQueue waitScore
DOOMSSubstation-Adjacent500 kV1,000 MW3.0 yrs74.1
Greenfield (DOOMS - VALLEY)Greenfield500 kV1,000 MW3.0 yrs70.0
TAP140469Substation-Adjacent230 kV300 MW3.0 yrs69.7
WAYNESBOROSubstation-Adjacent115 kV100 MW3.0 yrs67.7
DUPONT WAYNESBOROSubstation-Adjacent115 kV100 MW3.0 yrs67.1
TAP139776Substation-Adjacent115 kV100 MW3.0 yrs66.9
TAP139775Substation-Adjacent115 kV100 MW3.0 yrs66.5
FISHERSVILLESubstation-Adjacent115 kV100 MW3.0 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WORLD TEST SYSTEMS, INC. (INSTRUMENT MANUFACTURING FOR MEASURING AND TESTING ELECTRICITY AND ELECTRICAL SIGNALS), Waynesboro city. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.