BRUIN USA, INC. (NOT AVAILABLE)
ManufacturingStaunton, Virginia
BRUIN USA, INC. (NOT AVAILABLE) is a manufacturing datacenter candidate site in Staunton, Virginia. It screens at 53.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track BRUIN USA, INC. (NOT AVAILABLE)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Staunton, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Staunton | Greenfield | — | — | 3.1 yrs | 58.4 |
| STAUNTON | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 56.9 |
| VERONA | Substation-Adjacent | 115 kV | 100 MW | 3.8 yrs | 56.8 |
| Greenfield (WEST STAUNTON - VALLEY) | Greenfield | 230 kV | 300 MW | 3.8 yrs | 54.7 |
| DESIGNS IN COPPER, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.7 |
| CARDED GRAPHICS, LLC (CORRUGATED AND SOLID FIBER BOX MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.7 |
| VALLEY BLOCK OF SAUNTON (CONCRETE BLOCK AND BRICK MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 53.7 |
| FISHER AUTO PARTS, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 53.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.