AUGUSTA CO-OP FARM BUREAU, INC. (OTHER ANIMAL FOOD MANUFACTURING)
ManufacturingStaunton, Virginia
AUGUSTA CO-OP FARM BUREAU, INC. (OTHER ANIMAL FOOD MANUFACTURING) is a manufacturing datacenter candidate site in Staunton, Virginia. It screens at 54.7/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Staunton, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Staunton | Greenfield | — | — | 3.1 yrs | 59.5 |
| STAUNTON LEADER PUBLISHING CO. (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| KORETECK (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| FISHER AUTO PARTS, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| STAUNTON MACHINE WORKS, INC. (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| BRUIN USA, INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| VALLEY FEED CO. (OTHER ANIMAL FOOD MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.7 |
| DESIGNS IN COPPER, INC. (ALL OTHER MISCELLANEOUS FABRICATED METAL PRODUCT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 54.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for AUGUSTA CO-OP FARM BUREAU, INC. (OTHER ANIMAL FOOD MANUFACTURING), Staunton. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.