SOURCE4 (OTHER COMMERCIAL PRINTING)
ManufacturingRoanoke, Virginia
SOURCE4 (OTHER COMMERCIAL PRINTING) is a manufacturing datacenter candidate site in Roanoke, Virginia. It screens at 52.3/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track SOURCE4 (OTHER COMMERCIAL PRINTING)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Roanoke, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| MATT FUNK | Substation-Adjacent | 345 kV | 600 MW | 3.8 yrs | 61.8 |
| OZ Roanoke | Greenfield | — | — | 3.1 yrs | 59.8 |
| Greenfield (MATT FUNK - KANAWHA RIVER) | Greenfield | 345 kV | 600 MW | 3.8 yrs | 54.4 |
| NEW MILLENNIUM BUILDING SYSTEMS, LLC (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.4 |
| R.R. DONNELLEY & SONS CO., PRINTING DIV (BOOK PRINTING) | Manufacturing | — | — | 3.5 yrs | 52.3 |
| SWIFT PRINT (OTHER COMMERCIAL PRINTING) | Manufacturing | — | — | 3.5 yrs | 52.3 |
| ATLAS COPCO DRILLING SOLUTIONS (MINING MACHINERY AND EQUIPMENT MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 52.3 |
| LEISURE PUBLISHING CO., INC. (NOT AVAILABLE) | Manufacturing | — | — | 3.5 yrs | 52.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.