VCI Site

Shovel-Ready

Radford, Virginia · PJM

DC Readiness
46.8
Fair / 100

VCI Site is a shovel-ready datacenter candidate site in Radford, Virginia, interconnecting through PJM. It screens at 46.8/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityCITY OF RADFORD - (VA)not available

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance98.6 mi
Fiber providers3
Fiber coverage12.9%

Site characteristics

Site typeShovel-Ready
Acreage30 ac
Buildable load (est.)~12–30 MWland-based
Former useBrownfield

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLumos Networks
DC distance82.1 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track VCI Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
53
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
40
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Radford, ranked by DC Readiness.

Sites near VCI Site
SiteTypeVoltageCapacityQueue waitScore
Radford Army Ammunition PlantBrownfield—6 MW3.1 yrs53.9
INGLES STSubstation-Adjacent138 kV100 MW3.8 yrs53.3
UNKNOWN121136Substation-Adjacent138 kV100 MW3.8 yrs53.2
NORTH CLAYTORSubstation-Adjacent138 kV100 MW3.8 yrs53.2
UNKNOWN117068Substation-Adjacent138 kV100 MW3.8 yrs53.2
CLAYTORSubstation-Adjacent138 kV100 MW3.8 yrs53.0
EDGEMONTSubstation-Adjacent138 kV100 MW3.8 yrs53.0
DANAHER MOTION (MOTOR AND GENERATOR MANUFACTURING)Manufacturing——3.5 yrs49.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for VCI Site, Radford. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.