MAR-BAL, INC. (ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING)
ManufacturingPulaski County, Virginia
MAR-BAL, INC. (ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING) is a manufacturing datacenter candidate site in Pulaski County, Virginia. It screens at 50.6/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track MAR-BAL, INC. (ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING)
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Pulaski County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Pulaski | Greenfield | — | — | 3.1 yrs | 56.5 |
| WURNO | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.6 |
| PEAK CREEK | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 54.6 |
| VIRGINIA CHURCH FURNITURE, INC. (INSTITUTIONAL FURNITURE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| BONDCOTE CORP. (FABRIC COATING MILLS) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| JEFFERSON MILLS, INC. (YARN SPINNING MILLS) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| CVG, INC. DUBLIN #57 (AUTOMOBILE MANUFACTURING) | Manufacturing | — | — | 3.5 yrs | 50.7 |
| AMERICAN MACHINING SERVICES OF VIRGINIA (MACHINE SHOPS) | Manufacturing | — | — | 3.5 yrs | 50.7 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for MAR-BAL, INC. (ALL OTHER MISCELLANEOUS ELECTRICAL EQUIPMENT AND COMPONENT MANUFACTURING), Pulaski County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.