DC Readiness
56.4
Good / 100

9271 Capital Court is a shovel-ready datacenter candidate site in Manassas city, Virginia, interconnecting through PJM. It screens at 56.4/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPCOPT DC-6
IXP distance0.9 mi
Fiber providers4
Fiber coverage87.4%

Site characteristics

Site typeShovel-Ready
Acreage13 ac

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterAmazon Web Services
DC distance0.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity6.57¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$5,900

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
38
Fiber connectivity12%
98
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
35
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Manassas city, ranked by DC Readiness.

Sites near 9271 Capital Court
SiteTypeVoltageCapacityQueue waitScore
CANNON BRANCHSubstation-Adjacent230 kV300 MW3.8 yrs67.8
BATTERY HEIGHTS DPSubstation-Adjacent230 kV300 MW3.8 yrs67.3
TAP139226Substation-Adjacent230 kV300 MW3.8 yrs67.1
UNKNOWN156825Substation-Adjacent230 kV300 MW3.8 yrs67.1
TAP139225Substation-Adjacent230 kV300 MW3.8 yrs67.0
GAINESVILLESubstation-Adjacent230 kV300 MW3.8 yrs66.9
PRINCE WILLIAM DPSubstation-Adjacent230 kV300 MW3.8 yrs66.7
UNKNOWN116972Substation-Adjacent115 kV100 MW3.8 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for 9271 Capital Court, Manassas city. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.