Green Mount Logistics Center
Shovel-ReadyJames City, Virginia · PJM
Green Mount Logistics Center is a shovel-ready datacenter candidate site in James City, Virginia, interconnecting through PJM. It screens at 47.7/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in James City, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| LIGHTFOOT | Substation-Adjacent | 230 kV | 300 MW | 3.1 yrs | 68.0 |
| TOANO | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 65.0 |
| TAP147958 | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 64.3 |
| UNKNOWN114846 | Substation-Adjacent | 115 kV | 100 MW | 3.1 yrs | 58.7 |
| Greenfield (UNKNOWN114843 - TOANO) | Greenfield | 115 kV | 100 MW | 3.1 yrs | 58.6 |
| Lovett 64 Commerce Center | Shovel-Ready | — | — | — | 49.7 |
| Lovett 64 Commerce Center - Building 3 | Shovel-Ready | — | — | — | 49.3 |
| Lovett 64 Commerce Center - Building 2 | Shovel-Ready | — | — | — | 49.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Green Mount Logistics Center, James City. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.