Datacenter Sites in Harrisonburg City, Virginia

Harrisonburg City has 69 scored datacenter candidate sites averaging 54.8/100 DC Readiness, with a catalogued aggregate of 2,203 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

69
Candidate sites
54.8/100
Avg DC Readiness
2,203 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Harrisonburg City

Site-selection context for Harrisonburg City

Yessales_tax_exemption
Datacenter tax incentive
9.98¢/kWh
Commercial electricity
8.06¢/kWh
Industrial electricity
2
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in Harrisonburg City

Top datacenter sites in Harrisonburg City
SiteTypeVoltageCapacityQueue waitScore
VALLEYSubstation-Adjacent500 kV1,000 MW3.8 yrs65.6
OZ HarrisonburgGreenfield——3.1 yrs61.9
HARRISONBURGSubstation-Adjacent230 kV300 MW3.8 yrs61.5
GROTTOESSubstation-Adjacent230 kV300 MW3.8 yrs61.5
DAYTONSubstation-Adjacent230 kV300 MW3.8 yrs61.4
OZ HarrisonburgGreenfield——3.1 yrs60.9
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs60.0
Harrisonburg Power PlantBrownfield—3 MW3.1 yrs59.0
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs58.6
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs58.5
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs58.5
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs58.3
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs58.2
TAP139777Substation-Adjacent115 kV100 MW3.8 yrs57.1
WEYERS CAVESubstation-Adjacent115 kV100 MW3.8 yrs57.1
NORTH RIVER D.P.Substation-Adjacent115 kV100 MW3.8 yrs57.0
EC Near Harrisonburg Power PlantGreenfield——3.1 yrs55.5
CHRISTIAN LIGHT PUBLICATIONS (BOOK PRINTING)Manufacturing——3.5 yrs54.7
EDWARD SIGNS, INC., EDDIE (SIGN MANUFACTURING)Manufacturing——3.5 yrs54.7
ADAMS CONSTRUCTION CO. (ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING)Manufacturing——3.5 yrs54.7
ROCKINGHAM CO-OP FARM BUREAU, INC. (NOT AVAILABLE)Manufacturing——3.5 yrs54.7
TYSON FOODS, INC. (POULTRY PROCESSING)Manufacturing——3.5 yrs54.7
INTRAPAC, INC. (ALUMINUM SHEET, PLATE, AND FOIL MANUFACTURING)Manufacturing——3.5 yrs54.7
HARRISONBURG WHOLESALE MEAT CO., INC. (ANIMAL (EXCEPT POULTRY) SLAUGHTERING)Manufacturing——3.5 yrs54.7
ROCKINGHAM PUBLISHING CO., INC. (NOT AVAILABLE)Manufacturing——3.5 yrs54.7

Harrisonburg City datacenter FAQ

How many datacenter sites are in Harrisonburg City?
69 scored datacenter candidate sites, averaging 54.8/100 DC Readiness.
Does Harrisonburg City offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in Harrisonburg City?
FEMA's National Risk Index rates Harrisonburg City as "Relatively Moderate" (score 30).
What are industrial electricity rates in Harrisonburg City?
Average industrial electricity is 8.06¢/kWh and commercial is 9.98¢/kWh in Harrisonburg City.

Dataset updated . Screening estimates derived from public data sources.