Brink Road Site A is a shovel-ready datacenter candidate site in Greensville County, Virginia, interconnecting through PJM. It screens at 51.2/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPQTS Richmond (RIC1)
IXP distance59.8 mi
Fiber providers3
Fiber coverage67.7%

Site characteristics

Site typeShovel-Ready
Acreage207 ac
Buildable load (est.)~83–207 MWland-based

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterDatacenter 1307454847
DC distance45.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity4.93¢/kWh
Industrial electricity5.27¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$2,861

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Brink Road Site A

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
61
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Greensville County, ranked by DC Readiness.

Sites near Brink Road Site A
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN111421Substation-Adjacent230 kV300 MW3.8 yrs61.3
TAP148228Substation-Adjacent230 kV300 MW3.8 yrs61.1
Greenfield (WAKE - UNKNOWN175463)Greenfield500 kV1,000 MW3.8 yrs58.1
PLEASANT HILLSubstation-Adjacent115 kV100 MW3.8 yrs56.8
TAP148237Substation-Adjacent115 kV100 MW3.8 yrs56.7
TREGOSubstation-Adjacent115 kV100 MW3.8 yrs56.5
TAP148238Substation-Adjacent115 kV100 MW3.8 yrs56.5
UNKNOWN114508Substation-Adjacent115 kV100 MW3.8 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Brink Road Site A, Greensville County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.