Skip to content
Gridcensus

West Creek Campus 3

Shovel-Ready

Goochland, Virginia · PJM

DC Readiness
52.4
Fair / 100

West Creek Campus 3 is a shovel-ready datacenter candidate site in Goochland, Virginia, interconnecting through PJM. It screens at 52.4/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 3.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPEdgeConneX Richmond (EDCRIC01)
IXP distance10.2 mi
Fiber providers4
Fiber coverage37.2%

Site characteristics

Site typeShovel-Ready
Acreage366 ac
Buildable load (est.)~146366 MWland-based

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterEdgeConneX Richmond (EDCRIC01)
DC distance10.2 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.98¢/kWh
Industrial electricity6.17¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$7,139

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track West Creek Campus 3

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
41
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
61
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Goochland, ranked by DC Readiness.

Sites near West Creek Campus 3
SiteTypeVoltageCapacityQueue waitScore
NORTH POLESubstation-Adjacent230 kV300 MW3.8 yrs60.7
West Creek Campus 4: Oak HillShovel-Ready3.8 yrs52.5
West Creek Campus 5Shovel-Ready3.8 yrs52.4
West Creek Campus 2Shovel-Ready3.8 yrs52.3
West Creek Campus 7Shovel-Ready3.8 yrs52.2
West Creek Commerce CenterShovel-Ready3.8 yrs52.0
0 Three Chopt RoadShovel-Ready3.8 yrs52.0
Waters Edge BuildingShovel-Ready3.8 yrs51.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen