BARKER MICROFARADS (ELECTRONIC CAPACITOR MANUFACTURING)

Manufacturing

Carroll County, Virginia

DC Readiness
48.8
Fair / 100

BARKER MICROFARADS (ELECTRONIC CAPACITOR MANUFACTURING) is a manufacturing datacenter candidate site in Carroll County, Virginia. It screens at 48.8/100 DC Readiness.

Power & interconnection

Speed to power

Connectivity

Nearest IXP801 Main Street - Lenoir
IXP distance73.5 mi

Site characteristics

Site typeManufacturing

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenter801 Main Street - Lenoir
DC distance73.5 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.67¢/kWh
Industrial electricity5.33¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$3,866

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
54
Fiber connectivity12%
38
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in Carroll County, ranked by DC Readiness.

Sites near BARKER MICROFARADS (ELECTRONIC CAPACITOR MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
AXTONSubstation-Adjacent765 kV1,000 MW3.1 yrs72.5
JACKSONS FERRYSubstation-Adjacent765 kV1,000 MW3.1 yrs68.4
Greenfield (AXTON - JACKSONS FERRY)Greenfield765 kV1,000 MW3.1 yrs65.4
HUFFMANSubstation-Adjacent138 kV100 MW3.1 yrs62.6
Greenfield (AXTON - JACKSONS FERRY)Greenfield765 kV1,000 MW3.1 yrs62.2
Greenfield (ANTIOCH - JACKSONS FERRY)Greenfield500 kV1,000 MW3.1 yrs61.7
OZ CarrollGreenfield3.1 yrs58.7
Greenfield (HUFFMAN - JACKSONS FERRY)Greenfield138 kV100 MW3.1 yrs55.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BARKER MICROFARADS (ELECTRONIC CAPACITOR MANUFACTURING), Carroll County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.