Skip to content
Gridcensus

Datacenter Sites in BUENA VISTA (CITY), Virginia

BUENA VISTA (CITY) has 20 scored datacenter candidate sites averaging 54.5/100 DC Readiness, with a catalogued aggregate of 400 MW. FEMA rates local natural-hazard risk as "Relatively Moderate". The county has a datacenter tax incentive on record.

20
Candidate sites
54.5/100
Avg DC Readiness
400 MW
Catalogued capacity
theoretical aggregate
Relatively Moderate
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 22 in BUENA VISTA (CITY)

Site-selection context for BUENA VISTA (CITY)

Yessales_tax_exemption
Datacenter tax incentive
Commercial electricity
Industrial electricity
3
Fiber providers
Low
Water stress
$5,900
Land price / acre
1,300
Cooling degree days
4,000
Heating degree days
55°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

By site type

Top datacenter sites in BUENA VISTA (CITY)

Top datacenter sites in BUENA VISTA (CITY)
SiteTypeVoltageCapacityQueue waitScore
MODINE MFG. CO. (HEATING EQUIPMENT (EXCEPT WARM AIR FURNACES) MANUFACTURING)Manufacturing3.5 yrs54.7
BONTEX (PAPERBOARD MILLS)Manufacturing3.5 yrs54.7
ROCKBRIDGE AREA OCCUPATIONAL CENTER, INC (ALL OTHER PLASTICS PRODUCT MANUFACTURING)Manufacturing3.5 yrs54.7
SAYRE ENTERPRISES, INC. (ALL OTHER MISCELLANEOUS TEXTILE PRODUCT MILLS)Manufacturing3.5 yrs54.7
SHENANDOAH HARDWOOD LUMBER CO. (SAWMILLS)Manufacturing3.5 yrs54.7
FITZGERALD LUMBER & LOG CO., INC. (SAWMILLS)Manufacturing3.5 yrs54.7
EVERBRITE, LLC (SIGN MANUFACTURING)Manufacturing3.5 yrs54.7
ADVANCED DRAINAGE SYSTEMS, INC. (METAL TANK (HEAVY GAUGE) MANUFACTURING)Manufacturing3.5 yrs54.7
MUNDET-HERMETITE, INC. (NOT AVAILABLE)Manufacturing3.5 yrs54.7
DES CHAMPS TECHNOLOGIES (POWER BOILER AND HEAT EXCHANGER MANUFACTURING)Manufacturing3.5 yrs54.7
PAINTER SPACE PRINT CO. (BROADWOVEN FABRIC FINISHING MILLS)Manufacturing3.5 yrs54.7
BUENA VISTASubstation-Adjacent115 kV100 MW3.8 yrs54.6
TAP161412Substation-Adjacent115 kV100 MW3.8 yrs54.6
CUSHAWSubstation-Adjacent115 kV100 MW3.8 yrs54.6
BALCONY FALLSSubstation-Adjacent115 kV100 MW3.8 yrs54.6
GLASGOWSubstation-Adjacent115 kV100 MW3.8 yrs54.6
Savernake TractShovel-Ready3.8 yrs52.8
Reeves Brothers-Vulan Plan (Bfp-004)Industrial3.8 yrs52.3
Former Northwest Hardwoods SawmillShovel-Ready3.8 yrs52.3
Blue Bird BuildingShovel-Ready3.8 yrs52.3
Buena Vista Industrial ParkShovel-Ready3.8 yrs52.1
Greenfield (BALCONY FALLS - TAP161412)Greenfield115 kV100 MW3.8 yrs48.3

BUENA VISTA (CITY) datacenter FAQ

How many datacenter sites are in BUENA VISTA (CITY)?
20 scored datacenter candidate sites, averaging 54.5/100 DC Readiness.
Does BUENA VISTA (CITY) offer datacenter tax incentives?
Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
What is the natural-hazard risk in BUENA VISTA (CITY)?
FEMA's National Risk Index rates BUENA VISTA (CITY) as "Relatively Moderate" (score 30).

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BUENA VISTA (CITY), Virginia. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.