Greenfield (SIGURD - RED BUTTE)

Greenfield

Washington County, Utah · WECC

DC Readiness
63.6
Good / 100

Greenfield (SIGURD - RED BUTTE) is a greenfield datacenter candidate site in Washington County, Utah, interconnecting through WECC. It screens at 63.6/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSIGURD
Substation voltage345 kV
Available capacity600 MW
Utility commercial rate0.09¢/kWh

Speed to power

ISO / RTO regionWECC
Queue depth74
Avg queue wait1.7 yrs
Recent queue wait1.0 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPTonaquint Data Center - Saint George
IXP distance30.4 mi
Fiber providers9
Fiber coverage60.4%
Nearest cloud providerGCP
Nearest cloud regionus-west4
Cloud region distance126.4 mi

Site characteristics

Site typeGreenfield
Parcel ownerDIXIE ESCALANTE R E A, INC
Land owner typeprivate
Buildability70.0/100
Land cover (NLCD)Shrub/Scrub

Risk & environment

Flood zoneZone X
Water stress (WRI)3.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score85/100
Construction cost index66.0 (avg 100)

Location context

Nearest datacenterTonaquint Data Center - Saint George
DC distance30.4 mi
Nearest rail12.9 mi
Nearest gas pipeline0.7 mi
Nearest fiber route122.9 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.00¢/kWh
Industrial electricity7.41¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$8,684

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
59
Speed to power15%
34
Fiber connectivity12%
59
Energy cost10%
96
Water risk8%
50
Natural hazard8%
85
Buildability7%
70
Labor market4%
50
DC cluster4%
65
Land / acreage3%
41
Construction cost3%
95
Gas pipeline2%
98
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Washington County, ranked by DC Readiness.

Sites near Greenfield (SIGURD - RED BUTTE)
SiteTypeVoltageCapacityQueue waitScore
TAP206554Substation-Adjacent230 kV300 MW1.7 yrs72.7
TAP206303Substation-Adjacent230 kV300 MW1.7 yrs72.4
TAP206608Substation-Adjacent230 kV300 MW1.7 yrs72.4
TAP206657Substation-Adjacent230 kV300 MW1.7 yrs72.4
TAP206309Substation-Adjacent230 kV300 MW1.7 yrs70.8
UNKNOWN206549Substation-Adjacent230 kV300 MW1.7 yrs70.4
UNKNOWN201442Substation-Adjacent230 kV300 MW1.7 yrs70.3
RED BUTTESubstation-Adjacent345 kV600 MW1.7 yrs70.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (SIGURD - RED BUTTE), Washington County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.