UNKNOWN300458

Substation-Adjacent

Wood County, Texas · ERCOT

DC Readiness
53.6
Fair / 100

UNKNOWN300458 is a substation-adjacent datacenter candidate site in Wood County, Texas, interconnecting through ERCOT. It screens at 53.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN300458
Nearest grid bottleneck1395__A · 97 km (ERCOT)
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityFARMERS ELECTRIC COOP, INC - (TX)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPStream Data Centers - DFW VII
IXP distance64.1 mi
Fiber providers8
Fiber coverage85.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterDFW11 Garland
DC distance62.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.94¢/kWh
Industrial electricity6.47¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$5,395

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN300458

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
66
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Wood County, ranked by DC Readiness.

Sites near UNKNOWN300458
SiteTypeVoltageCapacityQueue waitScore
OZ WoodGreenfield3.4 yrs61.8
UNKNOWN307813Substation-Adjacent345 kV600 MW1.7 yrs61.5
EC Near ExxonMobil Hawkins Gas PlantGreenfield3.4 yrs61.4
EC Near ExxonMobil Hawkins Gas PlantGreenfield3.4 yrs60.7
EC Near ExxonMobil Hawkins Gas PlantGreenfield3.4 yrs60.0
EC Near ExxonMobil Hawkins Gas PlantGreenfield3.4 yrs59.9
EC Near ExxonMobil Hawkins Gas PlantGreenfield3.4 yrs59.8
EC Near ExxonMobil Hawkins Gas PlantGreenfield3.4 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN300458, Wood County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.