UNKNOWN304928 is a substation-adjacent datacenter candidate site in Wharton, Texas, interconnecting through ERCOT. It screens at 54.9/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN304928
Nearest grid bottleneckBI_SMR98_A · 72 km (ERCOT)
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityCENTERPOINT ENERGYinvestor owned

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPEdgeConneX Houston (EDCHOU01)
IXP distance57.0 mi
Fiber providers6
Fiber coverage60.3%

Site characteristics

Land contactWharton County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterEdgeConneX Houston (EDCHOU01)
DC distance57.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.14¢/kWh
Industrial electricity7.35¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$4,064

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN304928

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
66
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Wharton, ranked by DC Readiness.

Sites near UNKNOWN304928
SiteTypeVoltageCapacityQueue waitScore
EC Near Newgulf CogenGreenfield——3.4 yrs60.6
EC Near Newgulf CogenGreenfield——3.4 yrs60.6
EC Near Newgulf CogenGreenfield——3.4 yrs60.3
EC FFE Wharton CountyGreenfield——3.4 yrs60.3
OZ WhartonGreenfield——3.4 yrs60.2
HILLJESubstation-Adjacent345 kV600 MW1.7 yrs59.7
OZ WhartonGreenfield——3.4 yrs59.7
EC Near Newgulf CogenGreenfield——3.4 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN304928, Wharton. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.