Former Mine site at 30.865, -96.834
Former MineMilam, Texas · MISO
At a glance
Former Mine site at 30.865, -96.834 is a former mine datacenter candidate site in Milam, Texas, scoring 47.5/100 DC Readiness — 34th of 36 scored sites in the county. It sits in the MISO grid region and the ENTERGY TEXAS INC. service territory, where interconnection has averaged 3.5 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.
SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.
Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.
Site location
Get alerts
Track Mine Site
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Former Mine site at 30.865, -96.834 compare with other sites in Milam?
Former Mine site at 30.865, -96.834 ranks 34th of 36 scored candidate sites in Milam. Its 47.5/100 is about 13% below the county average of 54.3. It is about 16% below the Texas average of 56.4 and about 11% below the national average of 53.2.
Against the Texas average, its strongest sub-score is natural hazard (45 vs 44) and its weakest is power availability (30 vs 46). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Former Mine site at 30.865, -96.834 to power, fiber and other datacenters?
The nearest located transmission bottleneck is 1715__B (ERCOT), 32 miles away. For connectivity, the nearest internet exchange facility is FIBERTOWN Bryan Data Center at 30.4 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Riot Rockdale, 24.9 miles away.
What are the flood, water and hazard risks at Former Mine site at 30.865, -96.834?
At the county level, FEMA's National Risk Index rates Milam "Very High".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Milam, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| UNKNOWN306562 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 64.9 |
| UNKNOWN301186 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 61.9 |
| UNKNOWN304512 | Substation-Adjacent | 345 kV | 600 MW | 3.5 yrs | 60.9 |
| EC Near Sandow No 4 | Greenfield | — | — | 3.5 yrs | 60.4 |
| EC Near Sandow No 4 | Greenfield | — | — | 3.5 yrs | 60.3 |
| OZ Milam | Greenfield | — | — | 3.5 yrs | 59.3 |
| UNKNOWN302949 | Substation-Adjacent | 138 kV | 100 MW | 3.5 yrs | 59.3 |
| EC Near Sandow No 4 | Greenfield | — | — | 3.5 yrs | 58.5 |
Former Mine site at 30.865, -96.834: common questions
What is the DC Readiness score of Former Mine site at 30.865, -96.834?
Former Mine site at 30.865, -96.834 scores 47.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 34th of 36 scored sites in Milam. The Milam average is 54.3 and the Texas average is 56.4.
Which electric utility serves Former Mine site at 30.865, -96.834?
ENTERGY TEXAS INC. (investor owned) holds the retail service territory that contains the site; its holding company is ENTERGY CORP.
What grid region is Former Mine site at 30.865, -96.834 in?
Former Mine site at 30.865, -96.834 is in the MISO region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.
How far is Former Mine site at 30.865, -96.834 from an internet exchange?
The nearest internet exchange facility is FIBERTOWN Bryan Data Center, about 30.4 miles away; 9 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Former Mine site at 30.865, -96.834, Milam, TX”, https://gridcensus.com/datacenter-sites/texas/milam/mine-site-829e309f (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Former Mine site at 30.865, -96.834, Milam is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.