Skip to content
Gridcensus

UNKNOWN156744

Substation-Adjacent

Little River County, Texas · ERCOT

DC Readiness
55.9
Good / 100

UNKNOWN156744 is a substation-adjacent datacenter candidate site in Little River County, Texas, interconnecting through ERCOT. It screens at 55.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN156744
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityBOWIE-CASS ELECTRIC COOP, INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPARE-ON Hope
IXP distance29.7 mi
Fiber providers3
Fiber coverage47.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterARE-ON Hope
DC distance29.7 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.16¢/kWh
Industrial electricity7.12¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$2,717

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN156744

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
64
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
84
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Little River County, ranked by DC Readiness.

Sites near UNKNOWN156744
SiteTypeVoltageCapacityQueue waitScore
EC FFE Little River CountyGreenfield——1.4 yrs55.3
TAP142332Substation-Adjacent138 kV100 MW2.8 yrs55.2
PATTERSONSubstation-Adjacent138 kV100 MW2.8 yrs54.1
UNKNOWN121781Substation-Adjacent138 kV100 MW2.8 yrs53.9
UNKNOWN108107Substation-Adjacent138 kV100 MW2.8 yrs53.5
TAP142012Substation-Adjacent69 kV50 MW2.8 yrs52.7
ASHDOWN 69Substation-Adjacent69 kV50 MW2.8 yrs52.6
UNKNOWN159758Substation-Adjacent69 kV50 MW2.8 yrs51.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen