DC Readiness
47.0
Fair / 100

At a glance

Abandoned Gas Station is an industrial datacenter candidate site in Jefferson, Texas, scoring 47.0/100 DC Readiness — 52nd of 86 scored sites in the county. It sits in the MISO grid region and the ENTERGY TEXAS INC. service territory, where interconnection has averaged 3.5 years from request to operation.

Power & interconnection

Nearest grid bottleneckMDOPHR99_A · 109 km (ERCOT)
UtilityENTERGY TEXAS INC.investor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionMISO
Queue depth24
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPEquinix HO1 - Houston
IXP distance85.1 mi
Fiber providers9
Fiber coverage56.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterEquinix HO1 - Houston
DC distance85.1 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.60¢/kWh
Industrial electricity5.87¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$2,443

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Abandoned Gas Station

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Abandoned Gas Station compare with other sites in Jefferson?

Abandoned Gas Station ranks 52nd of 86 scored candidate sites in Jefferson. Its 47.0/100 is roughly in line with the county average of 50.5. It is about 17% below the Texas average of 56.4 and about 12% below the national average of 53.2.

Against the Texas average, its strongest sub-score is natural hazard (45 vs 44) and its weakest is power availability (30 vs 46). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Abandoned Gas Station to power, fiber and other datacenters?

The nearest located transmission bottleneck is MDOPHR99_A (ERCOT), 68 miles away. For connectivity, the nearest internet exchange facility is Equinix HO1 - Houston at 85.1 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Equinix HO1 - Houston, 85.1 miles away.

What are the flood, water and hazard risks at Abandoned Gas Station?

At the county level, FEMA's National Risk Index rates Jefferson "Very High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
66
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Jefferson, ranked by DC Readiness.

Sites near Abandoned Gas Station
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN301966Substation-Adjacent345 kV600 MW3.5 yrs58.8
UNKNOWN302906Substation-Adjacent230 kV300 MW3.5 yrs58.1
TAP310882Substation-Adjacent230 kV300 MW3.5 yrs57.3
PORT ACRES BULKSubstation-Adjacent230 kV300 MW3.5 yrs57.3
AMELIA BULKSubstation-Adjacent230 kV300 MW3.5 yrs57.3
HANKSSubstation-Adjacent230 kV300 MW3.5 yrs57.3
OZ JeffersonGreenfield——3.5 yrs57.2
KOLBSSubstation-Adjacent230 kV300 MW3.5 yrs57.2

Abandoned Gas Station: common questions

What is the DC Readiness score of Abandoned Gas Station?

Abandoned Gas Station scores 47.0/100 on the GridCensus DC Readiness scale, rated fair. It ranks 52nd of 86 scored sites in Jefferson. The Jefferson average is 50.5 and the Texas average is 56.4.

Which electric utility serves Abandoned Gas Station?

ENTERGY TEXAS INC. (investor owned) holds the retail service territory that contains the site; its holding company is ENTERGY CORP.

What grid region is Abandoned Gas Station in?

Abandoned Gas Station is in the MISO region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is Abandoned Gas Station from an internet exchange?

The nearest internet exchange facility is Equinix HO1 - Houston, about 85.1 miles away; 9 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Abandoned Gas Station, Jefferson, TX”, https://gridcensus.com/datacenter-sites/texas/jefferson/abandoned-gas-station-7122531b (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Abandoned Gas Station, Jefferson is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.