Jack County, Texas · ERCOT

DC Readiness
55.1
Good / 100

JACKSBORO is a substation-adjacent datacenter candidate site in Jack County, Texas, interconnecting through ERCOT. It screens at 55.1/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationJACKSBORO
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait1.7 yrs

Connectivity

Nearest IXPQTS Fort Worth (FTW1)
IXP distance53.0 mi
Fiber providers4
Fiber coverage43.4%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterDatacenter 00747985149
DC distance52.5 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.15¢/kWh
Industrial electricity14.04¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,320

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
63
Fiber connectivity12%
26
Energy cost10%
50
Water risk8%
44
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Jack County, ranked by DC Readiness.

Sites near JACKSBORO
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN305554Substation-Adjacent345 kV600 MW1.7 yrs55.1
JACK COUNTYSubstation-Adjacent345 kV600 MW1.7 yrs55.1
EC FFE Jack CountyGreenfield3.4 yrs55.0
UNKNOWN303036Substation-Adjacent138 kV100 MW1.7 yrs49.3
UNKNOWN303221Substation-Adjacent138 kV100 MW1.7 yrs49.3
UNKNOWN305641Substation-Adjacent138 kV100 MW1.7 yrs49.3
UNKNOWN306781Substation-Adjacent69 kV50 MW1.7 yrs46.9
Mine SiteFormer Mine1.7 yrs45.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for JACKSBORO, Jack County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.