Skip to content
Gridcensus

UNKNOWN308960

Substation-Adjacent

Hutchinson County, Texas · ERCOT

DC Readiness
53.4
Fair / 100

UNKNOWN308960 is a substation-adjacent datacenter candidate site in Hutchinson County, Texas, interconnecting through ERCOT. It screens at 53.4/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN308960
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySOUTHWESTERN PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MWMinnesota large-load statute (2025): DCs pay own costs, no cross-subsidy

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance43.2 mi
Fiber providers5
Fiber coverage70.4%

Site characteristics

Former usegas
Existing capacity127 MW
Retirement date2005-11-01

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance43.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.37¢/kWh
Industrial electricity5.51¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,274

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN308960

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
65
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Hutchinson County, ranked by DC Readiness.

Sites near UNKNOWN308960
SiteTypeVoltageCapacityQueue waitScore
EC Near RiverviewGreenfield——3.4 yrs61.5
EC Near RiverviewGreenfield——3.4 yrs60.9
EC Near Black Hawk StationGreenfield——3.4 yrs60.6
EC Near RiverviewGreenfield——3.4 yrs60.6
EC Near RiverviewGreenfield——3.4 yrs60.6
EC Near Black Hawk StationGreenfield——3.4 yrs60.5
EC Near Black Hawk StationGreenfield——3.4 yrs60.3
EC Near RiverviewGreenfield——3.4 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN308960, Hutchinson County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.