Floyd County, Texas · ERCOT

DC Readiness
47.7
Fair / 100

IRICK is a substation-adjacent datacenter candidate site in Floyd County, Texas, interconnecting through ERCOT. It screens at 47.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationIRICK
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait1.7 yrs

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance80.4 mi
Fiber providers2
Fiber coverage24.0%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterAligned Lubbock
DC distance39.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.30¢/kWh
Industrial electricity9.11¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,186

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power15%
63
Fiber connectivity12%
16
Energy cost10%
50
Water risk8%
44
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Floyd County, ranked by DC Readiness.

Sites near IRICK
SiteTypeVoltageCapacityQueue waitScore
WHITE RIVERSubstation-Adjacent345 kV600 MW1.7 yrs54.8
TAP308118Substation-Adjacent115 kV100 MW1.7 yrs48.5
TAP307988Substation-Adjacent115 kV100 MW1.7 yrs48.5
FLOYDSubstation-Adjacent115 kV100 MW1.7 yrs47.7
BARWISESubstation-Adjacent115 kV100 MW1.7 yrs47.7
UNKNOWN301731Substation-Adjacent69 kV50 MW1.7 yrs46.5
UNKNOWN310256Substation-Adjacent69 kV50 MW1.7 yrs46.5
UNKNOWN309580Substation-Adjacent69 kV50 MW1.7 yrs46.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for IRICK, Floyd County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.