Skip to content
Gridcensus

UNKNOWN307503

Substation-Adjacent

Cottle County, Texas · ERCOT

DC Readiness
57.0
Good / 100

UNKNOWN307503 is a substation-adjacent datacenter candidate site in Cottle County, Texas, interconnecting through ERCOT. It screens at 57.0/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN307503
Nearest grid bottleneckMIL_LIPAN_1 · 93 km (ERCOT)
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW
UtilitySOUTHWESTERN PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MWMinnesota large-load statute (2025): DCs pay own costs, no cross-subsidy

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance120.6 mi
Fiber providers2
Fiber coverage95.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterArgo Data Center
DC distance36.3 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.36¢/kWh
Industrial electricity9.45¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,059

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 4 nearby

Get alerts

Track UNKNOWN307503

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
66
Fiber connectivity12%
45
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Cottle County, ranked by DC Readiness.

Sites near UNKNOWN307503
SiteTypeVoltageCapacityQueue waitScore
OZ CottleGreenfield——3.4 yrs59.7
UNKNOWN303939Substation-Adjacent345 kV600 MW1.7 yrs58.9
UNKNOWN300263Substation-Adjacent230 kV300 MW1.7 yrs57.0
Old Palace Theater PaducahIndustrial——1.7 yrs47.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN307503, Cottle County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.