CLEAR LAKE POWER

Substation-Adjacent

Chambers County, Texas · ERCOT

DC Readiness
59.1
Good / 100

CLEAR LAKE POWER is a substation-adjacent datacenter candidate site in Chambers County, Texas, interconnecting through ERCOT. It screens at 59.1/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationCLEAR LAKE POWER
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait1.7 yrs

Connectivity

Nearest IXPNetrality Houston - 1301 Fannin
IXP distance19.9 mi
Fiber providers8
Fiber coverage56.8%

Site characteristics

Risk & environment

Flood zoneZone X
Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterNetrality Houston - 1301 Fannin
DC distance19.9 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.60¢/kWh
Industrial electricity5.87¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,315

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
63
Fiber connectivity12%
52
Energy cost10%
50
Water risk8%
44
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Chambers County, ranked by DC Readiness.

Sites near CLEAR LAKE POWER
SiteTypeVoltageCapacityQueue waitScore
ExxonMobil Baytown RefineryBrownfield138 kV54 MW3.4 yrs63.0
EC Near Cedar BayouGreenfield3.4 yrs60.7
UNKNOWN310907Substation-Adjacent345 kV600 MW1.7 yrs59.9
EC Near Enterprise Products OperatingGreenfield3.4 yrs59.0
BaytownBrownfield138 kV5 MW3.4 yrs58.3
EC Near Enterprise Products OperatingGreenfield3.4 yrs58.0
UNKNOWN303628Substation-Adjacent345 kV600 MW1.7 yrs57.6
UNKNOWN306477Substation-Adjacent345 kV600 MW1.7 yrs57.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for CLEAR LAKE POWER, Chambers County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.