Skip to content
Gridcensus

UNKNOWN304187

Substation-Adjacent

Carson County, Texas · ERCOT

DC Readiness
54.5
Fair / 100

UNKNOWN304187 is a substation-adjacent datacenter candidate site in Carson County, Texas, interconnecting through ERCOT. It screens at 54.5/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN304187
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait1.7 yrs

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance47.6 mi
Fiber providers5
Fiber coverage67.3%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score45/100

Location context

Nearest datacenterAmarillo Petroleum Building
DC distance47.6 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.40¢/kWh
Industrial electricity5.80¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,561

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
63
Fiber connectivity12%
36
Energy cost10%
50
Water risk8%
44
Natural hazard8%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Carson County, ranked by DC Readiness.

Sites near UNKNOWN304187
SiteTypeVoltageCapacityQueue waitScore
ALIBATESSubstation-Adjacent345 kV600 MW1.7 yrs58.0
MARTIN SWITCHING STATIONSubstation-Adjacent230 kV300 MW1.7 yrs57.5
DAVID SWINFORDSubstation-Adjacent345 kV600 MW1.7 yrs57.2
JACK RAMEY WINDSubstation-Adjacent345 kV600 MW1.7 yrs56.4
RAILHEADSubstation-Adjacent345 kV600 MW1.7 yrs56.4
YARNENSubstation-Adjacent115 kV100 MW1.7 yrs55.6
TAP310585Substation-Adjacent115 kV100 MW1.7 yrs55.5
PANTEX SOUTHSubstation-Adjacent115 kV100 MW1.7 yrs54.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN304187, Carson County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.