2223 Guadalupe St.

Industrial

Bexar County, Texas · ERCOT

DC Readiness
57.8
Good / 100

2223 Guadalupe St. is an industrial datacenter candidate site in Bexar County, Texas, interconnecting through ERCOT. It screens at 57.8/100 DC Readiness and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckD5_S1_1 · 13 km (ERCOT)
UtilityCITY OF SAN ANTONIO - (TX)municipalfavorable to large load · terms ≥ 75 MW

Speed to power

Texas note: Since August 3, 2026, ERCOT has paused approvals to energize new datacenter and crypto-mining loads of 75 MW or more until a verification audit and a community impact review are complete; both reports are due to the Public Utility Commission of Texas by December 10, 2026. ERCOT speed-to-power scores here were set before the pause and do not reflect it. ERCOT board update.

Interconnection outlookConstrained
≈ 3.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionERCOT
Queue depth1,169
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPForemost San Antonio
IXP distance2.4 mi
Fiber providers19
Fiber coverage87.2%

Site characteristics

Site typeIndustrial
Land contactBexar County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterLumen San Antonio 2
DC distance1.7 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.15¢/kWh
Industrial electricity8.50¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$7,540

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 2223 Guadalupe St.

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
78
Fiber connectivity12%
97
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Bexar County, ranked by DC Readiness.

Sites near 2223 Guadalupe St.
SiteTypeVoltageCapacityQueue waitScore
CALAVERAS 345 SWITCHYARDSubstation-Adjacent345 kV600 MW3.5 yrs70.0
CAGNON ROADSubstation-Adjacent345 kV600 MW3.5 yrs69.3
ARTHUR VON ROSENBERGSubstation-Adjacent345 kV600 MW3.5 yrs68.9
BROOKS FIELDSubstation-Adjacent345 kV600 MW3.5 yrs68.6
SKYLINESubstation-Adjacent345 kV600 MW3.5 yrs68.5
HILL COUNTRY 345Substation-Adjacent345 kV600 MW3.5 yrs68.2
EC Near W B TuttleGreenfield——3.5 yrs68.1
EC Near Tessman RoadGreenfield——3.5 yrs67.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for 2223 Guadalupe St., Bexar County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.