Edward Warren Field

Industrial

Bailey County, Texas · ERCOT

DC Readiness
49.5
Fair / 100

Edward Warren Field is an industrial datacenter candidate site in Bailey County, Texas, interconnecting through ERCOT. It screens at 49.5/100 DC Readiness and a 1.7 yrs average interconnection-queue wait.

Power & interconnection

Nearest grid bottleneckMIL_LIPAN_1 · 136 km (ERCOT)
UtilitySOUTHWESTERN PUBLIC SERVICE COinvestor ownedmoderate to large load · terms ≥ 100 MWMinnesota large-load statute (2025): DCs pay own costs, no cross-subsidy

Speed to power

Interconnection outlookFavorable
≈ 1.7 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionERCOT
Queue depth1,198
Avg queue wait1.7 yrs

Connectivity

Nearest IXPAmarillo Petroleum Building
IXP distance84.0 mi
Fiber providers3
Fiber coverage100.0%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterAligned Lubbock
DC distance67.0 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.08¢/kWh
Industrial electricity7.04¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$1,912

Regulatory climate

Favorablestate posture · as of 2026-08

No moratorium; fastest US interconnection (ERCOT). SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Edward Warren Field

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
66
Fiber connectivity12%
75
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
50
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Bailey County, ranked by DC Readiness.

Sites near Edward Warren Field
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN303131Substation-Adjacent115 kV100 MW1.7 yrs55.3
UNKNOWN307676Substation-Adjacent69 kV50 MW1.7 yrs53.4
UNKNOWN310330Substation-Adjacent69 kV50 MW1.7 yrs53.4
TAP302749Substation-Adjacent69 kV50 MW1.7 yrs53.3
UNKNOWN309570Substation-Adjacent69 kV50 MW1.7 yrs53.2
UNKNOWN303740Substation-Adjacent69 kV50 MW1.7 yrs53.1
UNKNOWN304886Substation-Adjacent69 kV50 MW1.7 yrs52.9
#9Substation-Adjacent69 kV50 MW3.3 yrs51.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.