UNKNOWN115356

Substation-Adjacent

Smith County, Tennessee · SERC

DC Readiness
63.3
Good / 100

UNKNOWN115356 is a substation-adjacent datacenter candidate site in Smith County, Tennessee, interconnecting through SERC. It screens at 63.3/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN115356
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityUPPER CUMBERLAND E M Ccooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPPeace Communications NSH2
IXP distance42.3 mi
Fiber providers8
Fiber coverage100.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterMeta Gallatin Data Center
DC distance24.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.46¢/kWh
Industrial electricity6.61¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$5,358

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN115356

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
73
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Smith County, ranked by DC Readiness.

Sites near UNKNOWN115356
SiteTypeVoltageCapacityQueue waitScore
TAP170572Substation-Adjacent161 kV100 MW1.0 yrs63.6
GORDONSVILLESubstation-Adjacent161 kV100 MW1.0 yrs63.6
NORTH CARTHAGESubstation-Adjacent161 kV100 MW1.0 yrs63.4
OZ SmithGreenfield——3.7 yrs61.6
OZ SmithGreenfield——3.7 yrs61.3
Mine SiteFormer Mine——1.0 yrs57.0
Industrial PropertyIndustrial——1.0 yrs57.0
Clark LumberIndustrial——1.0 yrs56.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN115356, Smith County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.