Substation-Adjacent site at 35.122, -89.870

Substation-Adjacent

Shelby, Tennessee · SERC

DC Readiness
63.0
Good / 100

At a glance

Substation-Adjacent site at 35.122, -89.870 is a substation-adjacent datacenter candidate site in Shelby, Tennessee, scoring 63.0/100 DC Readiness — 29th of 75 scored sites in the county. Its nearest substation is UNKNOWN115409 (0 mi, 161 kV). It sits in the SERC grid region and the CITY OF MEMPHIS - (TN) service territory, where interconnection has averaged 3.9 years from request to operation. GridCensus catalogs 100 MW of candidate capacity here.

Power & interconnection

Nearest substationUNKNOWN115409
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityCITY OF MEMPHIS - (TN)municipalfavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPEdgeConneX Memphis (EDCMEM01)
IXP distance5.8 mi
Fiber providers12
Fiber coverage57.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterEdgeConneX Memphis (EDCMEM01)
DC distance5.8 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.42¢/kWh
Industrial electricity11.95¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$5,264

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN115409

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Substation-Adjacent site at 35.122, -89.870 compare with other sites in Shelby?

Substation-Adjacent site at 35.122, -89.870 ranks 29th of 75 scored candidate sites in Shelby. Its 63.0/100 is roughly in line with the county average of 61.2. It is about 11% above the Tennessee average of 57.0 and about 18% above the national average of 53.2.

Against the Tennessee average, its strongest sub-score is power availability (60 vs 42) and its weakest is water (90 vs 89). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Substation-Adjacent site at 35.122, -89.870 to power, fiber and other datacenters?

The nearest mapped substation, UNKNOWN115409, is about 0 miles away and operates at 161 kV. For connectivity, the nearest internet exchange facility is EdgeConneX Memphis (EDCMEM01) at 5.8 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is EdgeConneX Memphis (EDCMEM01), 5.8 miles away.

What are the flood, water and hazard risks at Substation-Adjacent site at 35.122, -89.870?

At the county level, FEMA's National Risk Index rates Shelby "Relatively High".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
59
Fiber connectivity12%
86
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Shelby, ranked by DC Readiness.

Sites near Substation-Adjacent site at 35.122, -89.870
SiteTypeVoltageCapacityQueue waitScore
CORDOVASubstation-Adjacent500 kV1,000 MW3.9 yrs71.2
OZ ShelbyGreenfield——3.9 yrs66.0
EC Near AllenGreenfield——3.9 yrs65.2
OZ ShelbyGreenfield——3.9 yrs65.1
OZ ShelbyGreenfield——3.9 yrs65.1
OZ ShelbyGreenfield——3.9 yrs65.0
UNKNOWN115618Substation-Adjacent161 kV100 MW3.9 yrs64.4
OZ ShelbyGreenfield——3.9 yrs64.4

Substation-Adjacent site at 35.122, -89.870: common questions

What is the DC Readiness score of Substation-Adjacent site at 35.122, -89.870?

Substation-Adjacent site at 35.122, -89.870 scores 63.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 29th of 75 scored sites in Shelby. The Shelby average is 61.2 and the Tennessee average is 57.0.

What is the nearest substation to Substation-Adjacent site at 35.122, -89.870?

The nearest mapped substation is UNKNOWN115409, about 0 miles away, at 161 kV. GridCensus catalogs 100 MW of candidate capacity for the site.

Which electric utility serves Substation-Adjacent site at 35.122, -89.870?

CITY OF MEMPHIS - (TN) (municipal) holds the retail service territory that contains the site.

What grid region is Substation-Adjacent site at 35.122, -89.870 in?

Substation-Adjacent site at 35.122, -89.870 is in the SERC region. Projects interconnecting there have averaged a 3.9-year wait from queue request to operation.

How far is Substation-Adjacent site at 35.122, -89.870 from an internet exchange?

The nearest internet exchange facility is EdgeConneX Memphis (EDCMEM01), about 5.8 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Substation-Adjacent site at 35.122, -89.870, Shelby, TN”, https://gridcensus.com/datacenter-sites/tennessee/shelby/unknown115409-3c21016c (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Substation-Adjacent site at 35.122, -89.870, Shelby is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.