Meigs County, Tennessee · SERC

DC Readiness
61.7
Good / 100

WATTS BAR is a substation-adjacent datacenter candidate site in Meigs County, Tennessee, interconnecting through SERC. It screens at 61.7/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationWATTS BAR
Substation distance0.0 mi
Substation voltage161 kV
Available capacity100 MW
UtilityVOLUNTEER ELECTRIC COOPcooperativefavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPLCUB Data Center
IXP distance32.9 mi
Fiber providers3
Fiber coverage57.1%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score62/100

Location context

Nearest datacenterFrontier (supercomputer)
DC distance34.2 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.63¢/kWh
Industrial electricity5.93¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$5,327

Regulatory climate

Favorablestate posture · as of 2026-08

TVA territory, DC-friendly; fast vertically-integrated interconnection.

DC tax incentiveYes
Large-load threshold≥ 50 MW

TVA infrastructure-cost provisions apply to very large loads.

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track WATTS BAR

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
60
Speed to power20%
73
Fiber connectivity12%
65
Energy cost10%
50
Water risk7%
90
Natural hazard6%
62
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
47
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
45

Nearby comparable sites

Other scored datacenter candidate sites in Meigs County, ranked by DC Readiness.

Sites near WATTS BAR
SiteTypeVoltageCapacityQueue waitScore
WATTS BAR POWER STATIONSubstation-Adjacent500 kV1,000 MW1.0 yrs69.7
Watts Bar FossilBrownfield—240 MW3.7 yrs64.6
Greenfield (BULL RUN - WATTS BAR POWER STA)Greenfield500 kV1,000 MW1.0 yrs63.1
Greenfield (WATTS BAR POWER STATION - UNKN)Greenfield500 kV1,000 MW1.0 yrs63.1
Greenfield (SEQUOYAH - WATTS BAR POWER STA)Greenfield500 kV1,000 MW1.0 yrs62.7
UNKNOWN115743Substation-Adjacent161 kV100 MW1.0 yrs62.4
TAP154757Substation-Adjacent161 kV100 MW1.0 yrs62.3
TAP155404Substation-Adjacent161 kV100 MW1.0 yrs61.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WATTS BAR, Meigs County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.