Mine Site

Former Mine

Cocke, Tennessee · SERC

DC Readiness
47.1
Fair / 100

Mine Site is a former mine datacenter candidate site in Cocke, Tennessee, interconnecting through SERC. It screens at 47.1/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPBonnie Lane
IXP distance35.2 mi

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter 00904453635
DC distance34.0 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.54¢/kWh
Industrial electricity6.16¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$6,181

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
49
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Cocke, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN109832Substation-Adjacent115 kV100 MW3.7 yrs68.5
COSBYSubstation-Adjacent161 kV100 MW3.7 yrs66.8
OZ CockeGreenfield3.7 yrs62.8
Greenfield (WALTERS - TAP154517)Greenfield138 kV100 MW3.7 yrs61.8
Greenfield (TAP145900 - WALTERS)Greenfield115 kV100 MW3.7 yrs61.0
Greenfield (WALTERS - TAP154517)Greenfield138 kV100 MW3.7 yrs60.7
OZ CockeGreenfield3.7 yrs59.5
Greenfield (WALTERS - TAP154517)Greenfield138 kV100 MW3.7 yrs59.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Cocke. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.