Harry's #17

Industrial

Bradley County, Tennessee · SERC

DC Readiness
44.8
Fair / 100

Harry's #17 is a industrial datacenter candidate site in Bradley County, Tennessee, interconnecting through SERC. It screens at 44.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionSERC
Queue depth1

Connectivity

Nearest IXPPeace Communications CHA1
IXP distance25.4 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterPeace Communications CHA1
DC distance25.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.62¢/kWh
Industrial electricity5.99¢/kWh
Cooling degree days1,600
Heating degree days3,600
Land price / acre$8,324

Incentive detail: Sales tax exemption on DC equipment for $250M+ investments; no state income tax on wages.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
74
Fiber connectivity12%
24
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Bradley County, ranked by DC Readiness.

Sites near Harry's #17
SiteTypeVoltageCapacityQueue waitScore
SOUTH BRADLEYSubstation-Adjacent500 kV1,000 MW3.7 yrs77.0
TAP155408Substation-Adjacent500 kV1,000 MW3.7 yrs75.4
TAP155407Substation-Adjacent500 kV1,000 MW3.7 yrs74.9
SEQUOYAHSubstation-Adjacent500 kV1,000 MW3.7 yrs69.9
Greenfield (SEQUOYAH - WATTS BAR POWER STA)Greenfield500 kV1,000 MW3.7 yrs69.8
SOUTH CLEVELANDSubstation-Adjacent161 kV100 MW3.7 yrs69.0
TAP155403Substation-Adjacent161 kV100 MW3.7 yrs68.6
APISON PIKESubstation-Adjacent161 kV100 MW3.7 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.