Hilton Property

Industrial

York County, South Carolina · SERC

DC Readiness
56.3
Good / 100

Hilton Property is an industrial datacenter candidate site in York County, South Carolina, interconnecting through SERC. It screens at 56.3/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

UtilityYORK ELECTRIC COOP INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.7 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.9 yrs
Recent queue wait4.7 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPHSW-DC1RH
IXP distance0.4 mi
Fiber providers11
Fiber coverage57.2%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterHSW-DC1RH
DC distance0.4 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.72¢/kWh
Industrial electricity8.50¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$8,629

Regulatory climate

Favorablestate posture · as of 2026-08

Southeast, DC-friendly with active incentives and vertically-integrated utilities.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Hilton Property

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
59
Fiber connectivity12%
85
Energy cost10%
50
Water risk7%
84
Natural hazard6%
60
Buildability7%
50
Labor market4%
50
DC cluster4%
100
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in York County, ranked by DC Readiness.

Sites near Hilton Property
SiteTypeVoltageCapacityQueue waitScore
NEWPORT TIESubstation-Adjacent500 kV1,000 MW3.9 yrs71.6
SediverBrownfield—520 MW3.9 yrs70.6
TAP150276Substation-Adjacent230 kV300 MW3.9 yrs67.0
CATAWBA 230KV SWITCHING STATIONSubstation-Adjacent230 kV300 MW3.9 yrs67.0
UNKNOWN114800Substation-Adjacent230 kV300 MW3.9 yrs66.1
OZ YorkGreenfield——3.9 yrs65.8
OZ YorkGreenfield——3.9 yrs65.7
EC Near SediverGreenfield——3.9 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Hilton Property, York County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.