TAP152497 is a substation-adjacent datacenter candidate site in Oconee County, South Carolina, interconnecting through SERC. It screens at 59.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 1.0 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP152497
Substation distance0.0 mi
Substation voltage100 kV
Available capacity50 MW
UtilityBLUE RIDGE ELECTRIC COOP INC - (SC)cooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 1.0 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionSERC
Queue depth1
Avg queue wait1.0 yrs

Connectivity

Nearest IXPDC BLOX GSP1 - DCBLOX Greenville
IXP distance36.8 mi
Fiber providers6
Fiber coverage65.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score60/100

Location context

Nearest datacenterDartPoints Greenville, SC - GSP1
DC distance37.0 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.56¢/kWh
Industrial electricity7.81¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$7,485

Regulatory climate

Favorablestate posture · as of 2026-08

Southeast, DC-friendly with active incentives and vertically-integrated utilities.

DC tax incentiveYes

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP152497

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
49
Speed to power20%
73
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
84
Natural hazard6%
60
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
25

Nearby comparable sites

Other scored datacenter candidate sites in Oconee County, ranked by DC Readiness.

Sites near TAP152497
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN110410Substation-Adjacent500 kV1,000 MW1.0 yrs69.0
UNKNOWN110409Substation-Adjacent115 kV100 MW1.0 yrs60.7
UNKNOWN112300Substation-Adjacent100 kV50 MW1.0 yrs60.1
EAST CAMPUSSubstation-Adjacent100 kV50 MW1.0 yrs60.1
UNKNOWN112108Substation-Adjacent100 kV50 MW1.0 yrs59.2
TAP152490Substation-Adjacent100 kV50 MW1.0 yrs59.2
TAP152486Substation-Adjacent100 kV50 MW1.0 yrs59.2
TAP152488Substation-Adjacent100 kV50 MW1.0 yrs59.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen