Hardeeville

Brownfield

Jasper, South Carolina · SERC

DC Readiness
59.4
Good / 100

Hardeeville is a brownfield datacenter candidate site in Jasper, South Carolina, interconnecting through SERC. It screens at 59.4/100 DC Readiness with a catalogued 16 MW of candidate capacity and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Available capacity16 MW
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPCogent Fairfax
IXP distance46.9 mi
Fiber providers10
Fiber coverage85.6%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance87.4 mi

Site characteristics

Site typeBrownfield
Parcel ownerDominion Energy South Carolina, Inc
Land owner typeprivate
Buildability95.0/100
Land cover (NLCD)Developed, Medium Intensity
Former useoil
Existing capacity16 MW
Retirement date2022-03-01

Risk & environment

Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyPresent
Superfund siteCAROLINA METAL CASTINGS
Hazard sub-score40/100
Construction cost index95.5 (avg 100)

Location context

Nearest datacenterCogent Fairfax
DC distance46.9 mi
Nearest rail0.3 mi
Nearest gas pipeline4.0 mi
Nearest fiber route169.1 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity8.11¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$4,579

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
25
Speed to power15%
51
Fiber connectivity12%
74
Energy cost10%
91
Water risk8%
84
Natural hazard8%
40
Buildability7%
95
Labor market4%
50
DC cluster4%
50
Land / acreage3%
65
Construction cost3%
70
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Jasper, ranked by DC Readiness.

Sites near Hardeeville
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN167524Substation-Adjacent230 kV300 MW3.7 yrs71.3
UNKNOWN170159Substation-Adjacent230 kV300 MW3.7 yrs69.6
JASPERSubstation-Adjacent230 kV300 MW3.7 yrs69.2
TAP167523Substation-Adjacent230 kV300 MW3.7 yrs68.2
TAP142146Substation-Adjacent115 kV100 MW3.7 yrs67.7
UNKNOWN170157Substation-Adjacent115 kV100 MW3.7 yrs67.6
TAP170158Substation-Adjacent115 kV100 MW3.7 yrs66.4
TAP170160Substation-Adjacent230 kV300 MW3.7 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hardeeville, Jasper. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.