DC Readiness
58.9
Good / 100

EC Near Hardeeville is a greenfield datacenter candidate site in Jasper, South Carolina, interconnecting through SERC. It screens at 58.9/100 DC Readiness and a 3.7 yrs average interconnection-queue wait.

Power & interconnection

Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionSERC
Queue depth1
Avg queue wait3.7 yrs
Recent queue wait3.5 yrs
Completion rate15%
Withdrawal rate85%

Connectivity

Nearest IXPCogent Fairfax
IXP distance46.4 mi
Fiber providers7
Fiber coverage88.0%
Nearest cloud providerGCP
Nearest cloud regionus-east1
Cloud region distance89.7 mi

Site characteristics

Site typeGreenfield
Parcel ownerGEORGIA POWER CO
Land contactJasper County Assessor
Land owner typeprivate
Buildability50.0/100
Former usenear retired oil plant (5km)

Risk & environment

Flood zoneZone A (SFHA)
Water stress (WRI)0.80
Wetlands (NWI)Present
Critical habitatClear
Superfund nearbyClear
Hazard sub-score35/100
Construction cost index90.7 (avg 100)

Location context

Nearest datacenterCogent Fairfax
DC distance46.4 mi
Nearest rail2.8 mi
Nearest gas pipeline4.0 mi
Nearest fiber route166.2 mi
County hazard (FEMA NRI)Relatively High (40)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.87¢/kWh
Industrial electricity8.11¢/kWh
Cooling degree days2,000
Heating degree days2,400
Land price / acre$4,579

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
67
Fiber connectivity12%
73
Energy cost10%
91
Water risk8%
83
Natural hazard8%
35
Buildability7%
50
Labor market4%
50
DC cluster4%
50
Land / acreage3%
49
Construction cost3%
74
Gas pipeline2%
87
Tax incentive2%
100
Climate / cooling2%
25

Nearby comparable sites

Other scored datacenter candidate sites in Jasper, ranked by DC Readiness.

Sites near EC Near Hardeeville
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN167524Substation-Adjacent230 kV300 MW1.0 yrs62.2
UNKNOWN121080Substation-Adjacent230 kV300 MW1.0 yrs62.2
TAP170160Substation-Adjacent230 kV300 MW1.0 yrs62.2
McIntoshBrownfield230 kV178 MW1.0 yrs61.9
EC Near HardeevilleGreenfield3.7 yrs60.4
HardeevilleBrownfield16 MW3.7 yrs59.5
EC Coal Jasper CountyGreenfield3.7 yrs59.1
TAP142146Substation-Adjacent115 kV100 MW1.0 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC Near Hardeeville, Jasper. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.