Skip to content
Gridcensus

Datacenter Sites in Greenwood, South Carolina

Greenwood has 34 scored datacenter candidate sites averaging 58.3/100 DC Readiness, with a catalogued aggregate of 750 MW. FEMA rates local natural-hazard risk as "Relatively High". The county has a datacenter tax incentive on record.

34
Candidate sites
58.3/100
Avg DC Readiness
750 MW
Catalogued capacity
theoretical aggregate
Relatively High
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Greenwood

Site-selection context for Greenwood

Yessales_tax_exemption
Datacenter tax incentive
11.08¢/kWh
Commercial electricity
7.88¢/kWh
Industrial electricity
7
Fiber providers
Low
Water stress
$3,514
Land price / acre
2,000
Cooling degree days
2,400
Heating degree days
63°F
Mean annual temp

Incentive detail: Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.

By site type

Top datacenter sites in Greenwood

Top datacenter sites in Greenwood
SiteTypeVoltageCapacityQueue waitScore
OZ GreenwoodGreenfield——3.7 yrs64.3
EC Near Buzzard Roost GTGreenfield——3.7 yrs63.2
EC Near Buzzard Roost GTGreenfield——3.7 yrs63.1
EC Near Buzzard Roost GTGreenfield——3.7 yrs62.2
EC Near Buzzard Roost GTGreenfield——3.7 yrs62.1
EC Near Buzzard Roost GTGreenfield——3.7 yrs61.4
UNKNOWN116979Substation-Adjacent115 kV100 MW1.0 yrs61.3
EC Near Buzzard Roost GTGreenfield——3.7 yrs61.2
UNKNOWN117101Substation-Adjacent100 kV50 MW1.0 yrs59.9
UNKNOWN117094Substation-Adjacent100 kV50 MW1.0 yrs59.9
UNKNOWN114127Substation-Adjacent100 kV50 MW1.0 yrs59.9
UNKNOWN114125Substation-Adjacent100 kV50 MW1.0 yrs59.8
UNKNOWN117095Substation-Adjacent100 kV50 MW1.0 yrs59.8
UNKNOWN116978Substation-Adjacent100 kV50 MW1.0 yrs59.8
EC Near Buzzard Roost GTGreenfield——3.7 yrs59.8
UNKNOWN170147Substation-Adjacent100 kV50 MW1.0 yrs59.8
UNKNOWN115987Substation-Adjacent100 kV50 MW1.0 yrs59.6
UNKNOWN116981Substation-Adjacent100 kV50 MW1.0 yrs59.6
UNKNOWN116957Substation-Adjacent100 kV50 MW1.0 yrs59.6
UNKNOWN116989Substation-Adjacent100 kV50 MW1.0 yrs59.5
UNKNOWN116958Substation-Adjacent100 kV50 MW1.0 yrs59.2
TAP152232Substation-Adjacent100 kV50 MW1.0 yrs59.1
EC Near Buzzard Roost GTGreenfield——3.7 yrs56.9
EC Near Buzzard Roost GTGreenfield——3.7 yrs56.2
Tatham PropertyIndustrial——1.0 yrs55.4

Greenwood datacenter FAQ

How many datacenter sites are in Greenwood?
34 scored datacenter candidate sites, averaging 58.3/100 DC Readiness.
Does Greenwood offer datacenter tax incentives?
Sales tax exemption on DC equipment; fee-in-lieu of property tax for $50M+ investments.
What is the natural-hazard risk in Greenwood?
FEMA's National Risk Index rates Greenwood as "Relatively High" (score 40).
What are industrial electricity rates in Greenwood?
Average industrial electricity is 7.88¢/kWh and commercial is 11.08¢/kWh in Greenwood.

Dataset updated . Screening estimates derived from public data sources.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenwood, South Carolina. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.