Warren County, Pennsylvania · PJM

DC Readiness
51.8
Fair / 100

TAP138483 is a substation-adjacent datacenter candidate site in Warren County, Pennsylvania, interconnecting through PJM. It screens at 51.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP138483
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionPJM
Queue depth31
Avg queue wait3.8 yrs

Connectivity

Nearest IXPTierPoint Lehigh Valley
IXP distance15.7 mi
Fiber providers8
Fiber coverage25.3%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterPDC3 - 3949 Schelden Cir
DC distance15.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.50¢/kWh
Industrial electricity8.31¢/kWh
Cooling degree days1,000
Heating degree days4,900
Land price / acre$13,941

Incentive detail: UEZ sales tax exemption (reduced rate); BEIP/Grow NJ incentives for job creation.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
32
Fiber connectivity12%
46
Energy cost10%
50
Water risk8%
84
Natural hazard8%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
30
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Warren County, ranked by DC Readiness.

Sites near TAP138483
SiteTypeVoltageCapacityQueue waitScore
MARTINS CREEKSubstation-Adjacent230 kV300 MW3.8 yrs61.5
PORTLAND STATIONSubstation-Adjacent230 kV300 MW3.8 yrs60.9
OZ WarrenGreenfield2.6 yrs60.1
BUSHKILLSubstation-Adjacent230 kV300 MW3.8 yrs59.3
UNKNOWN132606Substation-Adjacent230 kV300 MW3.8 yrs59.1
UNKNOWN132943Substation-Adjacent230 kV300 MW3.8 yrs58.0
EC Near WC Landfill Energy LLCGreenfield2.6 yrs57.5
EC Near WC Landfill Energy LLCGreenfield2.6 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138483, Warren County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.