Skip to content
Gridcensus

Brodart Warehouse

Industrial

Lycoming County, Pennsylvania · PJM

DC Readiness
48.5
Fair / 100

At a glance

Brodart Warehouse is an industrial datacenter candidate site in Lycoming County, Pennsylvania, scoring 48.5/100 DC Readiness — 31st of 83 scored sites in the county. It sits in the PJM grid region and the PPL ELECTRIC UTILITIES CORP service territory, where interconnection has averaged 3.6 years from request to operation.

Power & interconnection

UtilityPPL ELECTRIC UTILITIES CORPinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load tariff proposal (≥100 MW): minimum take, collateral

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth404
Avg queue wait3.6 yrs
Recent queue wait5.5 yrs
Completion rate19%
Withdrawal rate81%

Connectivity

Nearest IXPWindstream - State College
IXP distance54.9 mi
Fiber providers12
Fiber coverage45.7%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterNautilus Cryptomine
DC distance47.5 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.69¢/kWh
Industrial electricity6.33¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$6,578

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Brodart Warehouse

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Brodart Warehouse compare with other sites in Lycoming County?

Brodart Warehouse ranks 31st of 83 scored candidate sites in Lycoming County. Its 48.5/100 is roughly in line with the county average of 50.3. It is roughly in line with the Pennsylvania average of 51.8 and roughly in line with the national average of 53.2.

Against the Pennsylvania average, its strongest sub-score is natural hazard (72 vs 71) and its weakest is fiber connectivity (63 vs 68). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Brodart Warehouse to power, fiber and other datacenters?

The nearest located transmission bottleneck is ELIMSPOR-SUNBURY A 230 KV (PJM), 18 miles away. For connectivity, the nearest internet exchange facility is Windstream - State College at 54.9 miles. 12 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Nautilus Cryptomine, 47.5 miles away.

What are the flood, water and hazard risks at Brodart Warehouse?

At the county level, FEMA's National Risk Index rates Lycoming County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
37
Fiber connectivity12%
63
Energy cost10%
50
Water risk7%
90
Natural hazard6%
72
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Lycoming County, ranked by DC Readiness.

Sites near Brodart Warehouse
SiteTypeVoltageCapacityQueue waitScore
LYCOMINGSubstation-Adjacent230 kV300 MW3.6 yrs58.8
UNKNOWN123662Substation-Adjacent230 kV300 MW3.6 yrs58.7
ELIMSPORTSubstation-Adjacent230 kV300 MW3.6 yrs58.5
UNKNOWN124465Substation-Adjacent230 kV300 MW3.6 yrs57.3
EC Lycoming Coal AreaGreenfield——3.6 yrs57.1
EC Lycoming Coal AreaGreenfield——3.6 yrs56.5
EC Coal Lycoming CountyGreenfield——3.6 yrs56.2
EC Lycoming Coal AreaGreenfield——3.6 yrs55.3

Brodart Warehouse: common questions

What is the DC Readiness score of Brodart Warehouse?

Brodart Warehouse scores 48.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 31st of 83 scored sites in Lycoming County. The Lycoming County average is 50.3 and the Pennsylvania average is 51.8.

Which electric utility serves Brodart Warehouse?

PPL ELECTRIC UTILITIES CORP (investor owned) holds the retail service territory that contains the site; its holding company is PPL CORPORATION.

What grid region is Brodart Warehouse in?

Brodart Warehouse is in the PJM region. Projects interconnecting there have averaged a 3.6-year wait from queue request to operation.

How far is Brodart Warehouse from an internet exchange?

The nearest internet exchange facility is Windstream - State College, about 54.9 miles away; 12 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Brodart Warehouse, Lycoming County, PA”, https://gridcensus.com/datacenter-sites/pennsylvania/lycoming-county/brodart-warehouse-ccd97bc3 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Brodart Warehouse, Lycoming County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.