Skip to content
Gridcensus

Carbon County, Pennsylvania · PJM

DC Readiness
52.7
Fair / 100

TAP146478 is a substation-adjacent datacenter candidate site in Carbon County, Pennsylvania, interconnecting through PJM. It screens at 52.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP146478
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityPPL ELECTRIC UTILITIES CORPinvestor ownedfavorable to large load · terms ≥ 100 MWLarge-load tariff proposal (≥100 MW): minimum take, collateral

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth31
Avg queue wait3.8 yrs

Connectivity

Nearest IXPTierPoint Lehigh Valley
IXP distance25.9 mi
Fiber providers8
Fiber coverage29.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterPDC3 - 3949 Schelden Cir
DC distance25.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.76¢/kWh
Industrial electricity5.69¢/kWh
Cooling degree days800
Heating degree days5,600
Land price / acre$8,381

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Keystone Opportunity Zone/KOEZ sales and property tax exemptions in designated areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP146478

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
38
Fiber connectivity12%
58
Energy cost10%
50
Water risk7%
90
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
85

Nearby comparable sites

Other scored datacenter candidate sites in Carbon County, ranked by DC Readiness.

Sites near TAP146478
SiteTypeVoltageCapacityQueue waitScore
Palmerton Zinc PileBrownfield—0 MW3.8 yrs63.9
UNKNOWN123643Substation-Adjacent230 kV300 MW3.8 yrs61.6
EC Coal Carbon CountyGreenfield——3.0 yrs58.7
UNKNOWN146484Substation-Adjacent230 kV300 MW3.8 yrs58.5
EC Coal Carbon CountyGreenfield——3.0 yrs56.3
EC Coal Carbon CountyGreenfield——3.0 yrs56.2
EC Coal Carbon CountyGreenfield——3.0 yrs56.1
EC Coal Carbon CountyGreenfield——3.0 yrs56.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP146478, Carbon County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.