Warren Coal Gasification Plant
IndustrialTrumbull County, Ohio · PJM
At a glance
Warren Coal Gasification Plant is an industrial datacenter candidate site in Trumbull County, Ohio, scoring 54.1/100 DC Readiness — 45th of 66 scored sites in the county. It sits in the PJM grid region and the OHIO EDISON CO service territory, where interconnection has averaged 5.2 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Risk & environment
Location context
Regulatory climate
DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.
AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.
Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
Site location
Get alerts
Track Warren Coal Gasification Plant
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Warren Coal Gasification Plant compare with other sites in Trumbull County?
Warren Coal Gasification Plant ranks 45th of 66 scored candidate sites in Trumbull County. Its 54.1/100 is roughly in line with the county average of 57.6. It is roughly in line with the Ohio average of 54.8 and roughly in line with the national average of 53.2.
Against the Ohio average, its strongest sub-score is fiber connectivity (82 vs 72) and its weakest is power availability (30 vs 37). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Warren Coal Gasification Plant to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is ark data centers - Youngstown, OH at 11.7 miles. 11 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is ark data centers - Youngstown, OH, 11.7 miles away.
What are the flood, water and hazard risks at Warren Coal Gasification Plant?
At the county level, FEMA's National Risk Index rates Trumbull County "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Trumbull County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| HIGHLAND | Substation-Adjacent | 345 kV | 600 MW | 5.2 yrs | 66.5 |
| OZ Trumbull | Greenfield | — | — | 5.2 yrs | 64.3 |
| EC Near Niles Power Plant | Greenfield | — | — | 5.2 yrs | 63.9 |
| EC Coal Trumbull County | Greenfield | — | — | 5.2 yrs | 63.6 |
| EC Near Niles Power Plant | Greenfield | — | — | 5.2 yrs | 63.6 |
| EC Coal Trumbull County | Greenfield | — | — | 5.2 yrs | 63.5 |
| UNKNOWN113300 | Substation-Adjacent | 138 kV | 100 MW | 5.2 yrs | 63.4 |
| EC Near Niles Power Plant | Greenfield | — | — | 5.2 yrs | 63.4 |
Warren Coal Gasification Plant: common questions
What is the DC Readiness score of Warren Coal Gasification Plant?
Warren Coal Gasification Plant scores 54.1/100 on the GridCensus DC Readiness scale, rated fair. It ranks 45th of 66 scored sites in Trumbull County. The Trumbull County average is 57.6 and the Ohio average is 54.8.
Which electric utility serves Warren Coal Gasification Plant?
OHIO EDISON CO (investor owned) holds the retail service territory that contains the site; its holding company is FIRSTENERGY CORP.
What grid region is Warren Coal Gasification Plant in?
Warren Coal Gasification Plant is in the PJM region. Projects interconnecting there have averaged a 5.2-year wait from queue request to operation.
How far is Warren Coal Gasification Plant from an internet exchange?
The nearest internet exchange facility is ark data centers - Youngstown, OH, about 11.7 miles away; 11 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Warren Coal Gasification Plant, Trumbull County, OH”, https://gridcensus.com/datacenter-sites/ohio/trumbull-county/warren-coal-gasification-plant-fb2b0c1a (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Warren Coal Gasification Plant, Trumbull County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.