Skip to content
Gridcensus

UNKNOWN113740

Substation-Adjacent

Summit County, Ohio · PJM

DC Readiness
60.8
Good / 100

UNKNOWN113740 is a substation-adjacent datacenter candidate site in Summit County, Ohio, interconnecting through PJM. It screens at 60.8/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 5.2 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN113740
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW
UtilityCLEVELAND ELECTRIC ILLUM COinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookConstrained
≈ 5.8 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth674
Avg queue wait5.2 yrs
Recent queue wait5.8 yrs
Completion rate17%
Withdrawal rate83%

Connectivity

Nearest IXPark data centers - Cleveland, OH
IXP distance3.6 mi
Fiber providers18
Fiber coverage55.0%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterInvolta Independence
DC distance3.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.55¢/kWh
Industrial electricity7.79¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$21,036

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN113740

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power20%
46
Fiber connectivity12%
86
Energy cost10%
50
Water risk7%
90
Natural hazard6%
70
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Summit County, ranked by DC Readiness.

Sites near UNKNOWN113740
SiteTypeVoltageCapacityQueue waitScore
CHAMBERLINSubstation-Adjacent345 kV600 MW5.2 yrs66.4
STARSubstation-Adjacent345 kV600 MW5.2 yrs66.4
OZ SummitGreenfield——5.2 yrs64.4
EC Near EngleGreenfield——5.2 yrs64.0
OZ SummitGreenfield——5.2 yrs63.6
OZ SummitGreenfield——5.2 yrs63.5
OZ SummitGreenfield——5.2 yrs62.3
AETNASubstation-Adjacent138 kV100 MW5.2 yrs62.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN113740, Summit County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.