Mine Site
Former MineSandusky County, Ohio · PJM
Mine Site is a former mine datacenter candidate site in Sandusky County, Ohio, interconnecting through PJM. It screens at 47.7/100 DC Readiness.
Power & interconnection
Connectivity
Site characteristics
Risk & environment
Location context
Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Sandusky County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| FREMONT ENERGY CENTER | Substation-Adjacent | 138 kV | 100 MW | 3.2 yrs | 69.7 |
| Greenfield (DAVIS-BESSE - BEAVER) | Greenfield | 345 kV | 600 MW | 3.2 yrs | 68.1 |
| Greenfield (DAVIS-BESSE - UNKNOWN158972) | Greenfield | 345 kV | 600 MW | 3.2 yrs | 66.5 |
| Greenfield (DAVIS-BESSE - UNKNOWN158972) | Greenfield | 345 kV | 600 MW | 3.2 yrs | 64.8 |
| Greenfield (FREMONT ENERGY CENTER - TAP137) | Greenfield | 138 kV | 100 MW | 3.2 yrs | 63.8 |
| Greenfield (UNKNOWN113728 - UNKNOWN114974) | Greenfield | 138 kV | 100 MW | 3.2 yrs | 62.0 |
| UNKNOWN113727 | Substation-Adjacent | 138 kV | 100 MW | 3.2 yrs | 61.7 |
| Greenfield (DAVIS-BESSE - BEAVER) | Greenfield | 345 kV | 600 MW | 3.2 yrs | 60.9 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.