UNKNOWN108807
Substation-AdjacentMason County, Ohio · PJM
UNKNOWN108807 is a substation-adjacent datacenter candidate site in Mason County, Ohio, interconnecting through PJM. It screens at 60.3/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.
AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.
Site location
Get alerts
Track UNKNOWN108807
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Mason County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Philip Sporn | Greenfield | — | — | 3.0 yrs | 59.5 |
| OZ Mason | Greenfield | — | — | 3.0 yrs | 59.1 |
| EC FFE Mason County | Greenfield | — | — | 3.0 yrs | 57.9 |
| EC Near Philip Sporn | Greenfield | — | — | 3.0 yrs | 57.8 |
| EC Near Philip Sporn | Greenfield | — | — | 3.0 yrs | 57.5 |
| EC Coal Mason County | Greenfield | — | — | 3.0 yrs | 57.4 |
| EC Near Philip Sporn | Greenfield | — | — | 3.0 yrs | 57.3 |
| UNKNOWN128257 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 57.3 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN108807, Mason County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.