Mine Site

Former Mine

Holmes County, Ohio · PJM

DC Readiness
42.8
Fair / 100

Mine Site is a former mine datacenter candidate site in Holmes County, Ohio, interconnecting through PJM. It screens at 42.8/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth9

Connectivity

Nearest IXPSecureData 365
IXP distance31.6 mi

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterSecureData 365
DC distance31.6 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.68¢/kWh
Industrial electricity9.43¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$9,808

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
48
Fiber connectivity12%
46
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Holmes County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
TAP171510Substation-Adjacent138 kV100 MW3.2 yrs65.2
WOOSTERSubstation-Adjacent138 kV100 MW3.2 yrs64.5
SOUTH MILLERSBURGSubstation-Adjacent138 kV100 MW3.2 yrs64.2
Greenfield (FIRSTENERGY R E BURGER - UNKNO)Greenfield138 kV100 MW3.2 yrs61.2
TAP154584Substation-Adjacent138 kV100 MW3.2 yrs61.0
Greenfield (FIRSTENERGY R E BURGER - UNKNO)Greenfield138 kV100 MW3.2 yrs60.3
EC Coal Holmes CountyGreenfield3.2 yrs60.0
EC Coal Holmes CountyGreenfield3.2 yrs59.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.