UNKNOWN137218
Substation-AdjacentGallia County, Ohio · PJM
UNKNOWN137218 is a substation-adjacent datacenter candidate site in Gallia County, Ohio, interconnecting through PJM. It screens at 52.2/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.
Power & interconnection
Connectivity
Risk & environment
Location context
Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.
Site location
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Gallia County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Coal Gallia County | Greenfield | — | — | 3.2 yrs | 60.4 |
| EC Coal Gallia County | Greenfield | — | — | 3.2 yrs | 60.0 |
| EC FFE Gallia County | Greenfield | — | — | 3.2 yrs | 59.2 |
| EC Coal Gallia County | Greenfield | — | — | 3.2 yrs | 56.7 |
| OZ Gallia | Greenfield | — | — | 3.2 yrs | 56.6 |
| EC Coal Gallia County | Greenfield | — | — | 3.2 yrs | 56.3 |
| UNKNOWN171368 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 52.2 |
| TAP147888 | Substation-Adjacent | 138 kV | 100 MW | 3.8 yrs | 52.2 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for UNKNOWN137218, Gallia County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.