Frick Gallagher Manufacturing Facility

Industrial

Fairfield County, Ohio · PJM

DC Readiness
53.3
Fair / 100

Frick Gallagher Manufacturing Facility is an industrial datacenter candidate site in Fairfield County, Ohio, interconnecting through PJM. It screens at 53.3/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPBresco Broadband Data Center
IXP distance27.8 mi
Fiber providers8
Fiber coverage33.7%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterGoogle
DC distance6.0 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.95¢/kWh
Industrial electricity9.71¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$7,551

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
45
Fiber connectivity12%
62
Energy cost10%
50
Water risk8%
90
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
80

Nearby comparable sites

Other scored datacenter candidate sites in Fairfield County, ranked by DC Readiness.

Sites near Frick Gallagher Manufacturing Facility
SiteTypeVoltageCapacityQueue waitScore
OZ FairfieldGreenfield3.2 yrs63.6
WEST MILLERSPORTSubstation-Adjacent345 kV600 MW3.8 yrs62.5
UNKNOWN151648Substation-Adjacent138 kV100 MW3.8 yrs57.4
SOUTH BALTIMORESubstation-Adjacent138 kV100 MW3.8 yrs56.6
WEST LANCASTER SUBSTATIONSubstation-Adjacent138 kV100 MW3.8 yrs56.0
UNKNOWN154527Substation-Adjacent138 kV100 MW3.8 yrs55.3
Anchor Hocking Plant # 2Industrial3.8 yrs53.4
Former Frick-GallagherIndustrial3.8 yrs53.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Frick Gallagher Manufacturing Facility, Fairfield County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.