Skip to content
Gridcensus

Mine Site

Former Mine

Defiance, Ohio · PJM

DC Readiness
49.4
Fair / 100

Mine Site is a former mine datacenter candidate site in Defiance, Ohio, interconnecting through PJM. It screens at 49.4/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityTHE TOLEDO EDISON COinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.8 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionPJM
Queue depth11
Avg queue wait3.8 yrs

Connectivity

Nearest IXPMicrotronix Datacenter Ottoville
IXP distance35.7 mi
Fiber providers13
Fiber coverage85.3%

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMicrotronix Datacenter Ottoville
DC distance35.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.11¢/kWh
Industrial electricity7.66¢/kWh
Cooling degree days900
Heating degree days5,400
Land price / acre$7,824

Regulatory climate

Moderatestate posture · as of 2026-08

DC tax incentives paused for 2026; AEP Ohio large-load tariff in force.

DC tax incentiveNo / suspended
Large-load threshold≥ 25 MW

AEP Ohio tariff: ≥25 MW, 85% take-or-pay, on-site-gen curtailment sync.

Incentive detail: DC sales tax exemption on equipment and electricity (2022 law); JobsOhio grants.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Mine Site

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
38
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
90
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
42
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
80

Nearby comparable sites

Other scored datacenter candidate sites in Defiance, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
OZ DefianceGreenfield3.2 yrs61.6
OZ DefianceGreenfield3.2 yrs59.7
UNKNOWN158927Substation-Adjacent138 kV100 MW3.8 yrs57.6
UNKNOWN137425Substation-Adjacent138 kV100 MW3.8 yrs57.5
UNKNOWN158926Substation-Adjacent138 kV100 MW3.8 yrs57.5
TAP155981Substation-Adjacent138 kV100 MW3.8 yrs57.4
SOUTH HICKSVILLESubstation-Adjacent138 kV100 MW3.8 yrs57.3
LOCKWOOD RDSubstation-Adjacent138 kV100 MW3.8 yrs57.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen